Heating Plant installation at an academy school in Milton Keynes, Buckinghamshire.
As part of the CIF schemes, GLE were employed by Surveyors to Education in to carry out the design, supply, installation, and commissioning of 0.3MW of primary heating plant at Bourton Meadow Academy.
The proposal consisted of replacement of existing gas fired boilers with air source heat pumps configured in a hybrid system with gas boiler backups. The scheme consisted of one plantroom on site with individual requirements for LTHW, DHW and configurations of ASHP installation.
Works commenced from our appointment in May 23 and were completed in September 23 including commissioning, client training and handover of site to the school. The below case study will detail the technical requirements on site, processes and involvement from Green Leaf and challenges faced with solutions proposed by us as the MEP Contractor.
Existing System
From existing surveys, it was identified that the existing LTHW system was supplied by 2No 200kw Gas Fired boilers, operating in an N+1 Configuration.
The existing DHW generation was provided using a calorifier to provide up to 500L of Hot water instantaneously. BMS Systems installed on site were Trend IQ2 software which had since become obsolete since the installation and commissioning date. An assessment of the heat emitters on site found that the school was separated into numerous blocks each serviced by different transmitters, details below:
Main Block – Fan Convectors
Yr 3-6 – Radiators – Single Panel
Nursery – Yr 2 – Underfloor heating
At the time of appointment, existing heating equipment had failed meaning that the client had to procure and install temporary heating plant to provide heating loads and DHW generation to the building, with this in mind and to reduce hire costs, GLE were instructed to commence works upon submission of tender documentation.
Technical Selection
The initial design pack issued identified that one block could be reconfigured to include AHSP with GasBoiler top up to achieve the desired heating loads. Theheating load identified using a standard GIFA dictatedthat 200kw of heating load should be available along with 500l of DHW.
Through discussions with various suppliers in the Heat pump market, it was determined that AIC Heating were best placed to provide a fully compliant system utilizing their 90Kw Aurax Heat Pump unit, in conjunction with their programmed Cascade controller, 500L Buffer vessel TMU and Silox domestic hot water cylinder.