PV Solar installation for a secondary school in Shrewsbury, Shropshire.
Green Leaf Engineering were employed by Bowmer and Kirkland to carry out the design, supply, installation, and commissioning of PV system in line with Belvidere schools’ energy requirements.
Scope of Works
The Main Building is split into 4 sections. As you step out onto the roof the first 2 sections consisting of 208 PV modules mounted onto a freestanding K2 Ballasted system orientated the length of the building NW to SE facing east and west on a 10 deg pitch.
The next 2 sections run across the back of the main roof SW to NE consisting of 128 PV modules mounted onto a freestanding K2 Ballasted system orientated across the length of the building NW to SE facing east and west on a 10 deg pitch. There are 2no Solis-80k-5g-pro inverters wired from a G99 panel.
Containment was installed to best suit to allow DC strings to be installed back to the inverters positioned up against the parapet. The 6 canopies span the length of 180 meters positioned around site consisting of 330 Pv modules wired back through the Bowmer and Kirkland provided infrastructure back to 6 inverters 1 S5-GC60k 5 x S5-GR3P20k fed again from a G99 Panel.
Technical Selections
* 600mm x 600mm Lighting Modules for Suspended Ceiling Grids
* 46no – 600mm x 600mm Recessed Lighting Modules for MF Plasterboard Ceilings
* 179no – Recessed Downlights for MF Plasterboard Ceilings
* 124no – Circular Surface MF Plasterboard Ceiling LED lights
This project had 500+ existing lights that needed changing to energy efficient LED light fittings. As part of the lighting design several factors were considered when selecting the light fittings.
Different rooms required lights with different power outputs, so the correct lux levels were achieved. Several rooms also required hygiene fittings and IP rated lights. Emergency lights and emergency running man lights were included to comply with regulations.
Ceiling type and room nature were a factor, as several different light fittings were needed due to different ceilings within rooms and different uses of rooms. Ranging from GP consultant rooms to Physiotherapy rooms to changing areas.